Cemex
  • 01 Products
    & Technologies
    • Cement
      • Impercem
      • EXTRA
      • Multiplast
    • Aggregates
      • Agriculture
      • Landscaping
      • Industrial
      • Sports
      • Environmental
    • ReadyMix
      • EVOLUTION ECO
      • Insularis
      • Promptis
      • Hidratium
      • Pervia
      • Returned concrete
      • Ecobind
      • RMX Mortar
      • Resilia
      • Liquid RCC
      • SUPAFLO
      • Grout
    • Admixtures
      • ReadyMix & Precast
      • Aggregates
      • Jobsite
      • Renovation
      • Recycling
      • Artscape & Masonery
      • Mining & Tunneling
      • Roads & Soils
      • Pavements
      • Flooring System
      • Decorative
      • Adhesive & Sealants
      • Gypsium & Plaster
      • Fibers
      • Cement
      • Coating
  • 02 Projects
    & Services
    • Projects
      • Domus
      • Water an Light - Hay les Roses
      • Assembly Wall
      • Capilla Gimnasio Campestre
      • Corrigall house
      • Net Zero Building
      • Rizolith Island
      • Calera House
      • oak house school
      • Vertical Farming
    • Services
      • Engineering
      • Research and Development
      • Laboratory
  • 03 Challenges
    • Construction Value Chain
      • Aesthetics
      • Comfort
      • Usable Space
      • Water Flow
      • Ecological Footprint
      • Steel Reinforcement
      • Structural Weight
      • Structural Cracking
      • Complex Construction Systems
      • Timeline
      • Waste Management
      • Seasonal Changes
      • Daily Productivity
      • Planning Joints
      • Labor and Equipment
      • Homogeneity
      • High quantity reinforcement
      • Unskilled workforce
      • Casting Time
      • Space Limitations
      • Safety
      • Weather
      • Late Schedule
      • Leakage & corrosion
      • Deteriorated Surfaces
      • Structural Capacity
      • Operational Usage
    • Sustainability
    • Covid 19
      • France Campaign : Construire Autrement / Build differently
      • UK campaign : Better by a distance
      • SPAIN Campaign - Ahora mas que nunca / Now more than ever
      • Covid 19 - Products and Solutions
Last update : 2025-06-14
Home / Challenges / Construction Value Chain
1 Aesthetics 2 Comfort 3 Usable Space 4 Water Flow 5 Ecological Footprint 6 Steel Reinforcement 7 Structural Weight 8 Structural Cracking 10 Timeline 11 Waste Management 12 Seasonal Changes 13 Daily Pouring Performances 14 Planning Joints 15 Labor & Equipment 16 Homogeneity 17 High Quantity Reinforcement 19 Casting time 18 Unskilled Worksforce 20 Space Limitations 21 Safety 22 Waether 23 Late Schedule 24 Leakage and Corrosion 25 deteriorated surface 26 Structural Capacity 27 Operational Usage 9 Complex Construction Systems

Aesthetics

Obtain an excellent apearance Enter

Comfort

Maintain an excellent thermal and acoustic comfort Enter

Usable Space

Increase the usable area or height Enter

Water Flow

Manage the flow and storage of water Enter

Ecological Footprint

Minimize the ecological foorprint Enter

Steel Reinforcement

Minimize the quantity of steel reinforcement Enter

Structural Weight

Reduce the total dead load Enter

Structural Cracking

Minimize structural fissures Enter

Complex Construction Systems

Guarantee the quality of concrete in advanced constructive systems Enter

Timeline

Minimize the total construction time Enter

Waste Management

Minimize construction material waste Enter

Seasonal Changes

Adaptations to climate changes Enter

Daily Productivity

Maximize the total volume of concrete poured daily Enter

Planning Joints

Minimize the total length of joints Enter

Labor and Equipment

Minimize the resources of labor and equipment Enter

Homogeneity

Guarantee homogeneity in concrete elements Enter

High quantity reinforcement

Guarantee the total filling with concrete through highly reinforced spaces Enter

Unskilled workforce

Minimize human errors during construction Enter

Casting Time

Minimize the time used to place concrete Enter

Space Limitations

Maximize work in limited spaces Enter

Safety

Maximize safety on jobsite Enter

Weather

Adaptation to unexpected weather changes Enter

Late Schedule

Recover time lost vs original time schedule Enter

Leakage & corrosion

Avoid infiltration of liquids that generate corrosion or damage Enter

Deteriorated Surfaces

Restoration of superficial damages to concrete Enter

Structural Capacity

Increase the structural capacity of the construction Enter

Operational Usage

Maximize the operative time during maintenance of construction Enter